Project Overview:

Subcontract for Civil, Bldg, Structural, UG Piping Intake & Piling Works

Scope includes:

  • Piling Works: RCC Bored cast in-situ piles = 1,600 Nos.  Concrete = 29,727 M3 -Rebar = 3,100 Ton .
  • Civil Works: Foundations, Trenches, Ducts banks, Drainage Networks, Surface paving etc Total Cast in-situ concrete = 21,600 M3,  Rebar = 2,015 ton, Precast Concrete = 14,900 M3.
  • Building Works: Pre-engineered buildings, Sheds., Intake Structure & Final marine works

 

Gallery:

 

Project details
  • 45 months
  • US$ 133,914,288
  • Abu Dhabi Offshore, UZ750 Islands
  • ZADCO
  • Petrofac Emirates DSME (PED)
  • P.O. Box 47467, Mussafah Industrial Area, Abu Dhabi,UAE
  • +971 2 554 6550
  • d@ajes.ae
  • Sun – Thu 07:30 – 17:30