Project Overview:
Subcontract for Civil, Bldg, Structural, UG Piping Intake & Piling Works
Scope includes:
- Piling Works: RCC Bored cast in-situ piles = 1,600 Nos. Concrete = 29,727 M3 -Rebar = 3,100 Ton .
- Civil Works: Foundations, Trenches, Ducts banks, Drainage Networks, Surface paving etc Total Cast in-situ concrete = 21,600 M3, Rebar = 2,015 ton, Precast Concrete = 14,900 M3.
- Building Works: Pre-engineered buildings, Sheds., Intake Structure & Final marine works