Al Jaber Energy Services
EPC For Main Control Building For Pipeline Network at Maqta

EPC For Main Control Building For Pipeline Network at Maqta

Project Overview:

Scope of  work includes Engineering, Procurement and Construction of Blast Resistant Control building along with associated Infrastructure and Tie-ins with existing facilities.  After building completion, existing control room equipment/panels to be migrated to newly constructed building with ZERO shutdown.

Project details
  • 24 months
  • US$ 19,700,000
  • Maqta, Abu Dhabi
  • ADNOC GAS PROCESSING (GASCO)
  • AJES
  • P.O. Box 47467, Mussafah Industrial Area, Abu Dhabi,UAE
  • +971 2 554 6550
  • d@ajes.ae
  • Sun – Thu 07:30 – 17:30
Drop us message